Temporary Notice of Renovation Works pasted on the glass window. The renovation can officially begin from 14th April to 16th April (3 days). We will start on 15th Tuesday and have a move-in ceremony (动土仪式) before that.
Showing posts with label Bedroom. Show all posts
Showing posts with label Bedroom. Show all posts
X-Building in Bahagia #12 - Hacking to start
Posted by
Gigi
on Saturday, April 12, 2008
Tags:
2 Storey HDB Terrace,
Backyard,
Bedroom,
HDB landed,
HDB Terrace,
Jalan Bahagia,
Patio,
Renovation,
X-Building
/
Comments:
X-Building in Bahagia #12 - Hacking to start
2008-04-12T10:02:00-07:00
Gigi
2 Storey HDB Terrace|Backyard|Bedroom|HDB landed|HDB Terrace|Jalan Bahagia|Patio|Renovation|X-Building|
Comments
)
Temporary Notice of Renovation Works pasted on the glass window. The renovation can officially begin from 14th April to 16th April (3 days). We will start on 15th Tuesday and have a move-in ceremony (动土仪式) before that.
X-Building in Bahagia #7 - Some Proposed Interior Layouts
Posted by
Gigi
on Sunday, March 9, 2008
Tags:
2 Storey HDB Terrace,
Backyard,
Bathroom,
Bedroom,
HDB landed,
HDB Terrace,
Jalan Bahagia,
Jalan Mamor,
Kitchen,
Living Room,
maisonette,
Patio,
Renovation,
X-Building
/
Comments:
5
)
Finally. We’ve given 5 briefs away, 1 gave up, we’re left with 4! I wonder how some people in the forums can go up to asking for 10 quotes! Chuck is already so tired coordinating and repeating the things we wanna do. I’m very tired opening the windows and doors and locking them up a while later. All in all, we done this 7 times within 2 weeks! To the 5 different IDs, another repeat session today to one of them, and one session with our friend. It is indeed a tiresome job to build this home.
Anyway, we also went to check out the Modern Living Home Fair at Expo, and we realized we’ve only covered 100m in an hour before we got to rush off to another place. Our last stop at the Expo was at Supreme Flooring - a super laminate flooring which I was rather impressed with. Anyway I might check it out again this week. On the other hand, I have no idea what to expect from the IDs while waiting for all the quotes to come in.

Image from Chweech's reno thread at myhometown.sg
I mentioned about thisuseless original floor plan
Anyway, we also went to check out the Modern Living Home Fair at Expo, and we realized we’ve only covered 100m in an hour before we got to rush off to another place. Our last stop at the Expo was at Supreme Flooring - a super laminate flooring which I was rather impressed with. Anyway I might check it out again this week. On the other hand, I have no idea what to expect from the IDs while waiting for all the quotes to come in.
Image from Chweech's reno thread at myhometown.sg
I mentioned about this
X-Building in Bahagia #4 - Keys collected. What to Hack?
Posted by
Gigi
on Tuesday, February 12, 2008
Tags:
2 Storey HDB Terrace,
Backyard,
Bathroom,
Bedroom,
HDB landed,
HDB Terrace,
Jalan Bahagia,
Jalan Mamor,
Kitchen,
Living Room,
Patio,
Renovation,
X-Building
/
Comments:
1
)
Good news, we got the keys! Tomorrow will also be the first time we're meeting an ID. We found her contact when we were doing our rounds some time back around the area. The contractor Christina told us she designed some homes in the same area so we reckon she should be experienced to offer some good ideas and solutions to very problematic space planning issues.



I'm pretty excited about it and have been thinking about what changes we want to do to our new home. I would like to bring our concerns up to the ID and listen out to sound advice. That of course, includes staying within budget. We need a major revamp here!
I'm pretty excited about it and have been thinking about what changes we want to do to our new home. I would like to bring our concerns up to the ID and listen out to sound advice. That of course, includes staying within budget. We need a major revamp here!